Dear Partners!
As part of the Budapest DOCK road renovation, the last stage of the „Gyapjútárházi street” renovation will be the reconstruction of the „Gyapjútárházi street” junction towards the suburban railway. The concrete road surface at the junction will be repaired halfway from 2025.05.19. The repair will last until 2025.06.24.
During the road renovation, the terminal can be approached via the „Gabonatárházi street” – railway crossing – „Gyapjútárházi street” route according to the map below, i.e. „Gyapjútárházi street” will be closed from the suburban railway side. Traffic leaving the terminal can leave the terminal via the usual route, i.e. „Gyapjútárházi street” will be one-way towards the suburban railway side.
We apologize for the inconvenience caused, please use the above access routes during the road renovation by our partners. We thank you for your cooperation.
